A solar quote that only shouts a dollar-per-watt figure is incomplete. Australian households should expect itemised hardware, soft costs, approvals, and assumptions — the same discipline you would apply to a major renovation quote.

Itemised solar quotation on a kitchen table — line items make three-way comparison possible.

Hardware identity, not vague brands

Panel model and wattage, inverter model, optimiser or microinverter counts, mounting system, and battery model if included should be named. “Tier-1 panels” is not a line item.

Line itemWhy it belongsRed flag if missing
STC discountDefines net capitalCannot compare net price
Scaffold / roof accessCommon soft costSurprise invoice later
Switchboard worksOften requiredHidden electrical risk
Meter / connection feesNetwork pathwayTimeline and cost drift
Export limit assumptionShapes yieldOptimistic generation
Warranty labour termsAftercare costParts-only surprises
  • Demand the same itemisation from every bidder
  • Separate optional extras clearly
  • Note validity dates and panel stock caveats
  • Include who lodges distributor paperwork

If it is not on the quote, it is on you later.

Payment schedule

Deposits, delivery, install, and commissioning stages should be written. Large upfront payments for unverified companies are avoidable risk.

Exclusions list

Good quotes also list what is not included — asbestos roof works, heritage fees, trenching to sheds. Exclusions are clarity, not hostility.